Mainly Feature :
1)Material: high quality nylon material, durable.
2)Comfortable handle design: handle plus a soft lining, comfortable without Lehua.
3)D-ring buckle design: You can hang storage bags, garbage bags and so on
4)Three size options: According to their dog size and dog training, choose for themselves and their dog's traction length.
SAFETY AND DURABILITY FOR YOUR BIG DOG
Long Trainer 1 inch nylon dog leash is built strong with high quality nylon for large dogs. As opposed to cotton leashes, nylon will hold up when handling big dogs. Cotton leashes can break easily and you will regret not investing! Long Trainer 1 inch is built with heavy duty materials made for daily use over an extended period of time. Great for your large dog!
COILING SYSTEM
Long leashes can get tangled easily when storing and moving leaving you with a big mess. Our Hook and Loop Coiling System makes transporting your leash easy. Simply coil up your leash normally and then wrap the strap around it. Secure the hook and loop closure on itself and you are ready to go.
SIZING
20 Feet: Great for exploratory walking, potty with shorter range.
30 Feet: Close ball play, using the potty with freedom.
50 Feet: Recall training, playing with tennis balls, total playing freedom, off-leash simulation.
Pettom Nylon Training Dog Leash Gear Cotton Web Long Lead Dog traction rope Great for Teaching Play Camping or Backyard For Large Medium and Small Dogs - B078WM8MQ8