NYLON TRAINING LEAD - This durable, long, nylon dog training leash will outlast cotton leashes. All stitching is reinforced and the nickel plated clip swivels to resist twisting. Our long dog leash is great for medium and large dogs. You'll love using it as a backyard dog leash, for off leash dog training, and more.
DIMENSIONS - This dog leash measures 1 inch wide by long 50. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming!
METAL RING FUNTION:1.It can be DIY handle, according to own palm adjust the size automatically. As the picture 4 shows 2、It is fasten to a post in the yard,the lawn or the park.
LONG LEASH: This training leash is great for teaching your dog recalls. It has the length needed to allow them to wander and ensure your command to come! is obeyed.
Allows you to teach your dog recalls and other obedience skills.
Built Strong
Nylon leashes have a long lifespan, cotton leashes get frail and break faster than you would think. Free Range 1 inch is built with heavy duty materials that can withstand daily use over an extended period of time. It can be used with medium and large size dogs.
Sizing
15 Feet 30 Feet 50 Feet 100 Feet 200 Feet.
Zhixuanke 1in wide by 15ft 30ft 50ft 100ft 200feet long Nylon Training Leash - For Large Medium and Small Dogs - Long Lead - Great for Training Play Camping or Backyard - B07B2KZ3VW