Wish List (0)My AccountShopping CartCheckout

Pettom Nylon Training Dog Leash Gear Cotton Web Long Lead Dog traction rope Great for Teaching Play Camping or Backyard For Large Medium and Small Dogs - B078WM8MQ8

0 reviews
Product Code: B078WM8MQ8
Availability: In Stock
Price: $55.55 $34.98

Available Options

* Size:

Add to Cart
Add to Wish List
Add to Compare

  • LONG LEASH-This training leash is great for teaching your dog recalls. Long leash allows dog for more wandering area and freedom, great choice for dog training,strolling, walking, playing, teaching.

  • SUPER TRAINING LEAD- This durable, long, nylon dog leash will outlast cotton leashes. Our long dog leash is great for small and medium and large dogs.

  • COMFORTABLE DESIGN: handle plus a soft lining, comfortable without Lehua.

  • D-RING BUCKLE & CLIP DESIGN: You can hang storage bags, garbage bags and so on. And the nickel plated clip swivels to resist twisting

  • DIMENSIONS - This dog leash measures by 20ft/30ft/50ft long. Great for hiking, camping, training.

  •   Mainly Feature :

      1)Material: high quality nylon material, durable.

      2)Comfortable handle design: handle plus a soft lining, comfortable without Lehua.

      3)D-ring buckle design: You can hang storage bags, garbage bags and so on

      4)Three size options: According to their dog size and dog training, choose for themselves and their dog's traction length.

    SAFETY AND DURABILITY FOR YOUR BIG DOG

    Long Trainer 1 inch nylon dog leash is built strong with high quality nylon for large dogs. As opposed to cotton leashes, nylon will hold up when handling big dogs. Cotton leashes can break easily and you will regret not investing! Long Trainer 1 inch is built with heavy duty materials made for daily use over an extended period of time. Great for your large dog!

    COILING SYSTEM
    Long leashes can get tangled easily when storing and moving leaving you with a big mess. Our Hook and Loop Coiling System makes transporting your leash easy. Simply coil up your leash normally and then wrap the strap around it. Secure the hook and loop closure on itself and you are ready to go.

    SIZING
    20 Feet: Great for exploratory walking, potty with shorter range.
    30 Feet: Close ball play, using the potty with freedom.
    50 Feet: Recall training, playing with tennis balls, total playing freedom, off-leash simulation.

    Pettom Nylon Training Dog Leash Gear Cotton Web Long Lead Dog traction rope Great for Teaching Play Camping or Backyard For Large Medium and Small Dogs - B078WM8MQ8